Job Cost Sheet help
System
Posts: 100,534 🤖 Admin 🤖
Hello Everyone,
Im in need of your help, I have been give the following info and been asked to put together a job cost sheet however i dont know where to start!!!!
Using the following data as appropriate prepare a job cost sheet for a customers order, the estimates of materials, labour and machine time is as follows:
Material all in stock valued FIFO £1500
(replacement cost is £1650)
Labour Operations 20hrs @ 9.00 per hour
Assembly 17hrs @ 11.20 per hour
Packing 12hrs @ 10.60 per hour
Machine time - estimate 30 hours
Machine Dept Packing
Assembly
Overheadslast year £20,000 £8,000 £4,000
OH This yrs Budget £22,000 £9,000 £5,000
Labour hrs last yr £10,000 £8,000 £4,000
Lab Hrs this Yr Bud £9,000 £10,000 £4,000
Machine hours lstyr £9,000
this yr bud £10,000
This is the layout i have to answer on:
JOB COST SHEET
£ £
DIRECT MATERIAL
LABOUR:
OPERATORS
ASSEMBLY
PACKING
PRIME COST
PRODUCTION OVERHEADS:
MACHINERY
ASSEMBLY
PACKING
TOTAL COST
THANK YOU
Im in need of your help, I have been give the following info and been asked to put together a job cost sheet however i dont know where to start!!!!
Using the following data as appropriate prepare a job cost sheet for a customers order, the estimates of materials, labour and machine time is as follows:
Material all in stock valued FIFO £1500
(replacement cost is £1650)
Labour Operations 20hrs @ 9.00 per hour
Assembly 17hrs @ 11.20 per hour
Packing 12hrs @ 10.60 per hour
Machine time - estimate 30 hours
Machine Dept Packing
Assembly
Overheadslast year £20,000 £8,000 £4,000
OH This yrs Budget £22,000 £9,000 £5,000
Labour hrs last yr £10,000 £8,000 £4,000
Lab Hrs this Yr Bud £9,000 £10,000 £4,000
Machine hours lstyr £9,000
this yr bud £10,000
This is the layout i have to answer on:
JOB COST SHEET
£ £
DIRECT MATERIAL
LABOUR:
OPERATORS
ASSEMBLY
PACKING
PRIME COST
PRODUCTION OVERHEADS:
MACHINERY
ASSEMBLY
PACKING
TOTAL COST
THANK YOU
0
Comments
-
Re:Job Cost Sheet help
This doesn't look particularly beautiful here because I can't lay it out as on a spreadsheet but I hope it helps. Note ECR standards do not require an understanding of Relevant Costs, but I valued the material on this basis.
£ £
DIRECT MATERIAL 1,650
LABOUR:
OPERATORS 20 x £9 180
ASSEMBLY 17 x £11.20 190
PACKING 12 x £10.60 127
PRIME COST 2,148
PRODUCTION OVERHEADS:
hrs OAR
MACHINERY 30 £2.20 66
ASSEMBLY 17 £0.90 15
PACKING 12 £1.25 15
TOTAL COST 2,244
0 -
Re:Job Cost Sheet help
Thank You very much!!!!0 -
Re:Job Cost Sheet help
That is what i got but for some reason i was unsure!
I now have another tiny question if anyone could please point me in the right direction of how to start off?
A factory job cost card number XYZ123 shows the following price cost:
Direct Materials - 55.5 tons of steel @ £286 per ton
Direct Wages - Depo A - 60 hrs @ £13 per hour
Depo B - 80 hrs @ £12 per hour
The budget for the year reveals the following:
Variable Overheads
Depo A £24,000 for 36,000 direct labour hrs
Depo B £40,000 for 50,000 direct labour hrs
Fixed Overheads
Total budgeted direct labour hrs for the whole factory 90,000
Total budgeted expenditure £67,500
Required
A) Calculate the cost of job XYZ123
Estimate the percentage profit obtained if the price quoted to the customer was £17,995
Do i work this out in exactly the same way?
Thanks
0 -
Re:Job Cost Sheet help
Yes. Follow Sandy's answer as a guide. Assuming that the comapny is using absorption costing then the split of overheads between fixed and variable is not relevant. Calculate an OAR for each dept based on the two added together.0