standard cost card

iainiow
iainiow Registered Posts: 20 New contributor 🐸
Hi,

I am doing the dec 07 PEV practice exam and im having a brain block on creating the standard cost card (task 1.2)

Ive created the top two rows, loose tea and direct materials, but i cant for the life of me work out how to get the quantity of 0.2 for direct materials and fixed production overhead. alas AAT arent as good at showing workings in PEV practive answers as FRA papers.

anyone care to offer a desperate man some assistance?? :confused1:

Comments

  • SandyHood
    SandyHood Registered, Moderator Posts: 2,034 mod
    Have a look at mine if you wish
    send an email with this as the exact subject line (it must be precise to work)
    PEV Dec 07 Sandy Answer
    My answer comes as an automated reply after my out of office
    i cant for the life of me work out how to get the quantity of 0.2 for direct materials and fixed production overhead

    Standard cost card for the production of 1,000 tea bags
    Quantity Unit price Total cost

    Direct materials (loose tea) .................. 3kgs
    Direct materials (bags for the tea)........ 1,000
    Direct labour (machine operators)........ 0.2hrs
    Fixed production overheads .................. 0.2hrs

    I'm guessing you mean 0.2 hours

    Budgeted batches 20,000
    Budgeted labour hours 4,000

    So Budgeted labour hours........= 0.2 labour hours
    ........Budgeted batches ........ per batch

    And fixed overhead is absorbed on a labour hour basis
    Sandy
    sandy@sandyhood.com
    www.sandyhood.com
Privacy Policy