sophie_612sophie_612 LondonRegistered Posts: 107
Hi,

The answer for below is 1800 can anyone tell me how they worked this out please?

Thanks
Sophie


Comments

  • hal978hal978 LondonMAAT, AAT Licensed Accountant Posts: 184
    On average one hour produces 7.5 items (i.e. 60/8)
    1,840 hours available x 7.5 = 13,800 items can be produced
    15,600 required - 13,800 produced = 1,800 subcontracted
  • sophie_612sophie_612 LondonRegistered Posts: 107
    hal978 said:

    On average one hour produces 7.5 items (i.e. 60/8)
    1,840 hours available x 7.5 = 13,800 items can be produced
    15,600 required - 13,800 produced = 1,800 subcontracted

    thank you for explaining