labour cost
System
Posts: 100,534 🤖 Admin 🤖
how did you calculate it?<BR>basic hours<BR>overtime time n half<BR>over time double<BR>rate 7<BR>opps forgot the figures
0
Comments
-
labour cost
Hi,<BR><BR>I think i did normal x £7, overtime and half x £10.50 and overtime double x £14.<BR><BR>Not sure if that is right though, as the other papers i did, had a different way of working out the labour cost.0 -
labour cost
i did 7 x something =56, 000<BR>7 x 1.5 x something = 14, 000<BR>7 x 2 x something = 15, 500<BR><BR>total 85,500<BR>i think0 -
labour cost
you 100% right0 -
labour cost
oh thank you <img src="i/expressions/face-icon-small-smile.gif" border="0">0 -
labour cost
<BR>Total normal rate = 7 x 9500 = 66500<BR>overtime premium (times 1.5) = 7 x 500 x 1.5 = 5250<BR>overtime premium (times 2) = 7 x 1000 x 2 = 14000<BR><BR>Total labour cost = 66500 + 5250 + 14000 = 85750<BR><BR>0